Call NowRequest Service

Renovation Plumbing

Rough-in, relocation, and finish plumbing for bathroom and kitchen renovations

Renovation plumbing requires accurate rough-in work, coordination with other trades, and finish installation that matches the fixture selection. We work with homeowners, contractors, and designers to ensure the plumbing aligns with the overall project plan.

What we inspect

  • Existing rough-in dimensions and locations
  • Supply line material and condition
  • Drain slope and configuration
  • Wall and floor structure for new penetrations
  • Water pressure and flow adequacy for new fixture count

Our process

1

Review plans, layouts, and fixture selections with you or your contractor

2

Provide a written estimate for rough-in and finish work

3

Complete rough-in before walls are closed

4

Coordinate with other trades at the rough-in stage

5

Install fixtures after finishes are complete

6

Test all connections and do a final walkthrough

Factors that may affect cost

We provide written estimates before any work begins. The following factors may affect the scope and cost.

  • Number of fixtures being added or relocated
  • Distance from existing supply and drain runs
  • Fixture selection — some require specific rough-in dimensions
  • Whether permits are required for your project

Frequently asked questions

Have a question?

For urgent issues, call directly. For planned work, use the form.

(204) 555‑0100Request Service

Request a callback

Re: Renovation Plumbing

This form is not monitored for emergencies. Call for urgent issues.